Planning: Zvika Friedman
Electricity: Yuval Tiktin
Air conditioning: H.R.O.O.C. |||
For Comverse, Data Center was designed and executed at the Tier 3 survivability level.
Also a server farm with an area of 600 square meters.
The project included a separate HVAC system and two chillers systems.
The redundancy was managed by a control system and HMI that was written specifically for the needs of the site – including reporting to maintenance support in case of malfunctions and alerts.
It was designed and carried out a double UPS systems and double power generators
In the critical room, gas extinguishing was installed – with suction smoke detection system.