Design:. A.M. International Ltd | | | |
Chillers farm steps for cooling Data Center support in N + 1 Backup.
-
Starting with the simulator of the Piping.
-
Concrete casting of the Bases.
-
Welding the plumbing and creating a "water bank" with taps for emergencies and/or maintenance.
-
Performing pressure tests.
-
Chillers crane works.
-
Running and checking the systems in the roof and then running the critical equipment in the data center.